8/29/2010 |
10:05 AM |
12:55 PM |
2.8 |
Cleaned up; test fitted the turtleback (in the jig) onto the fuselage. |
|
8/18/2010 |
8:00 PM |
8:33 PM |
0.6 |
Trimmed the ends of the turtleback with the Fein |
|
8/15/2010 |
8:28 AM |
1:49 PM |
5.3 |
Did the 2 ply UNI layup on the inside of the turtleback. Measured and marked, cut glass, added the tape to the joints, micro, squeegee, trim, peel ply, the whole enchilada. |
|
8/10/2010 |
7:02 PM |
8:17 PM |
1.2 |
Epoxy / floxed on the 3" flange, pinned it down then peel plied the joint |
|
8/8/2010 |
1:15 PM |
5:54 PM |
4.7 |
Finished installing foam pieces into the turtleback jig. Trimmed the top edge flush for the 3" flange. Cleaned up. |
|
8/8/2010 |
11:15 AM |
12:37 PM |
1.4 |
Continued cutting and fitting foam pieces into the turtleback jig |
|
8/8/2010 |
9:30 AM |
9:55 AM |
0.4 |
Vacuumed up all the foam mess from the previous days' work. |
|
8/7/2010 |
2:00 PM |
6:32 PM |
4.5 |
Leveled the top of the frame, left side, then taped the whole jig with box sealing tape. Cut some foam to 6" strips and started fitting / screwing them to the jig. |
|
8/5/2010 |
8:08 PM |
8:39 PM |
0.5 |
Glued some foam blanks together with foam in a can |