Date Start Finish Hours Work
8/29/2010 10:05 AM 12:55 PM 2.8 Cleaned up; test fitted the turtleback (in the jig) onto the fuselage.
8/18/2010 8:00 PM 8:33 PM 0.6 Trimmed the ends of the turtleback with the Fein
8/15/2010 8:28 AM 1:49 PM 5.3 Did the 2 ply UNI layup on the inside of the turtleback. Measured and marked, cut glass, added the tape to the joints, micro, squeegee, trim, peel ply, the whole enchilada.
8/10/2010 7:02 PM 8:17 PM 1.2 Epoxy / floxed on the 3" flange, pinned it down then peel plied the joint
8/8/2010 1:15 PM 5:54 PM 4.7 Finished installing foam pieces into the turtleback jig. Trimmed the top edge flush for the 3" flange. Cleaned up.
8/8/2010 11:15 AM 12:37 PM 1.4 Continued cutting and fitting foam pieces into the turtleback jig
8/8/2010 9:30 AM 9:55 AM 0.4 Vacuumed up all the foam mess from the previous days' work.
8/7/2010 2:00 PM 6:32 PM 4.5 Leveled the top of the frame, left side, then taped the whole jig with box sealing tape. Cut some foam to 6" strips and started fitting / screwing them to the jig.
8/5/2010 8:08 PM 8:39 PM 0.5 Glued some foam blanks together with foam in a can