Date Start Finish Hours Work
11/27/2010 12:06 PM 5:23 PM 5.3 Microed the turtleback then did the 2 ply UNI layup on the outside. Peel plied the layup then cleaned up.
11/27/2010 9:00 AM 11:28 AM 2.5 Made the aluminum insert for the turtleback. Cut glass, filled the epoxy pump and laid plastic for the next layup.
11/24/2010 3:15 PM 5:11 PM 1.9 Sanded the depressions into the foam on the turtleback as prep for the outside layup
11/9/2010 6:55 PM 8:09 PM 1.2 Made a yardstick-based sanding board and sanded the outside of the turtleback smooth.
11/9/2010 5:55 PM 6:15 PM 0.3 Marked window locations on the foam in pencil.