4/26/2010 |
7:50 PM |
8:42 PM |
0.9 |
Added the 4" x 4" 3 ply BID layup and LWA-2 |
|
4/25/2010 |
4:12 PM |
5:27 PM |
1.2 |
Carved foam from the inside of FC-1 and floxed in a new LWA-6 |
|
4/25/2010 |
11:15 AM |
12:15 PM |
1 |
Alodined the new LWA-2 and LWA-6 pieces, cut the layups over the misplaced LWA-2, heated it then removed it |
|
1/31/2010 |
10:31 AM |
4:10 PM |
5.7 |
Covered the wing foam with newspaper, laid up the 6 ply UNI shear web layup, applied it to the microed shear web, added the 3 ply BID pads, LWA2 & 3 then peel plied & cleaned up |
|
1/24/2010 |
1:26 PM |
5:02 PM |
3.6 |
Cut glass for the shear web, epoxied in the W-18s, microed in the LWA4s and laid out a pattern on the jig table for the shear web |
|
1/24/2010 |
10:22 AM |
12:42 PM |
2.3 |
Trimmed the wing attach depressions layup, alodined the W-18s, cleaned up & started prep for the shear web layup |
|
1/20/2010 |
7:14 PM |
8:16 PM |
1 |
Did the 2 ply BID layup in the wing attach depressions and microed in LWA6 |
|
1/19/2010 |
6:26 PM |
8:43 PM |
2.3 |
Made the wing attach depressions and W-18s |
|
1/18/2010 |
8:33 PM |
9:34 PM |
1 |
Removed screws and finishing nails from micro joint done yesterday, removed the front halves of jigs 1-4 |
|
1/17/2010 |
4:07 PM |
6:12 PM |
2.1 |
Microed FC1, FC2 and FC3 together in the jigs, microed the FC1 shell onto the root end of FC1 |
|
7/12/2009 |
1:30 PM |
4:40 PM |
3.2 |
Sanded shear web. Removed front half of jigs, microed foam parts, painted epoxy on shear web then joined all, checked jigs & weighted for cure |
|
7/12/2009 |
11:32 AM |
12:00 PM |
0.5 |
Removed peel ply from shear web |
|
4/26/2009 |
1:40 PM |
5:12 PM |
3.5 |
Finished the shear web layup and the 3 ply BID pads under LWA2 & 3 |
|
4/26/2009 |
9:43 AM |
11:05 AM |
1.4 |
Started the shear web layup |
|
4/26/2009 |
6:15 AM |
9:15 AM |
3 |
Laid out waxed paper w/sizes and marked same |
|
4/19/2009 |
10:06 AM |
12:45 PM |
2.7 |
Cleaned up from previous steps then cut glass for the next layup |
|
4/19/2009 |
7:35 AM |
9:15 AM |
1.7 |
Installed W-18s, added paper and tape to wings in prep for shear web layup |
|
4/14/2009 |
7:00 PM |
8:30 PM |
1.5 |
Cut & adjusted W18s, cut foam to fit then alodined W-18s |
|
4/3/2009 |
6:50 PM |
7:45 PM |
0.9 |
Microed in the LWA4s and LWA6, then made aluminum blanks for the W-18s |
|
4/2/2009 |
6:05 PM |
7:40 PM |
1.6 |
Alodined the aluminum parts LWA2, -3, -4 and -6 |
|
4/1/2009 |
6:00 PM |
6:35 PM |
0.6 |
Did the 2 ply BID layup on the inside of the wing bolt recesses |
|
4/1/2009 |
5:15 PM |
5:45 PM |
0.5 |
Prepared for the recess 2 ply BID layups; cut glass, etc. |
|
3/31/2009 |
5:10 PM |
6:02 PM |
0.9 |
Finished the wing bolt access recesses & the recess for LWA6 |
|
3/30/2009 |
6:00 PM |
8:05 PM |
2.1 |
Made 2 each LWA6 pieces then carved and sanded the wing bolt access cutouts in FC1 |
|
3/30/2009 |
5:10 PM |
5:30 PM |
0.3 |
Took the front jigs off |
|
3/8/2009 |
1:12 PM |
2:32 PM |
1.3 |
Microed FC-1, 2 & 3 together in the jig, peel plied clamped and weighted them down |
|
3/8/2009 |
10:53 AM |
12:32 PM |
1.6 |
Made some wood strips for clamping foam then final jigged FC-1, 2 & 3 in preparation for joining them with micro |
|
3/7/2009 |
9:02 AM |
11:58 AM |
2.9 |
Adjusted the jigs until all the foam core pieces fit properly, then cleaned up |