3/10/2002 |
12:50 PM |
1:50 PM |
1 |
Installed and safety wired in drilled head bolts in the lower firewall, second set of four |
|
3/10/2002 |
10:55 AM |
12:00 PM |
1.1 |
Installed and safety wired in drilled head bolts in the lower firewall |
|
3/9/2002 |
7:10 AM |
8:10 AM |
1 |
1 BID layup on forward side of lower FW |
|
3/7/2002 |
6:30 PM |
7:30 PM |
1 |
1 BID layup on lower FW aft side |
|
3/6/2002 |
6:40 PM |
8:20 PM |
1.7 |
Cut out electrical duct holes in lower FW, glued aluminum inserts into FW, test fit |
|
3/5/2002 |
6:30 PM |
8:30 PM |
2 |
Cut longeron holes in lower firewall and test fitted same onto fuselage |
|
3/3/2002 |
3:00 PM |
5:40 PM |
2.7 |
Cut out new lower firewall and aluminum inserts |
|
2/2/2002 |
3:00 PM |
5:00 PM |
2 |
Drilled out bevel head screws in firewall and floxed in drilled head bolts |
|
1/19/2002 |
5:10 PM |
5:50 PM |
0.7 |
F-28 2 UNI full length other side |
|
1/19/2002 |
9:30 AM |
10:00 AM |
0.5 |
Trimmed F-28 |
|
1/18/2002 |
2:45 PM |
4:00 PM |
1.2 |
Stripped F-28, laid on 2 UNI full length |
|
1/5/2002 |
2:00 PM |
2:30 PM |
0.5 |
Did 2x BID and 1 ply UNI layup on F-28 |
|
1/5/2002 |
11:25 AM |
12:10 PM |
0.8 |
Cut number 2 F-28 in half and prepared for UNI layup |
|
1/2/2002 |
7:05 PM |
8:05 PM |
1 |
Trimmed and sanded the new F-28 |
|
1/1/2002 |
10:45 AM |
12:30 PM |
1.8 |
Laid up new F-28 both sides, peel plied same |
|
1/1/2002 |
8:30 AM |
10:10 AM |
1.7 |
Made new F-28 out of foam, prepared it for its layup and cleaned up |
|
7/5/2001 |
7:45 PM |
8:00 PM |
0.2 |
Finished sanding same - chapter 4 is complete! (Or so I thought…) |
|
7/5/2001 |
5:15 PM |
6:00 PM |
0.8 |
Scissor-trimmed the permanent firewall layups then sanded the edges smooth |
|
7/4/2001 |
11:30 AM |
12:25 PM |
0.9 |
Laid up the glass on the aft side of the permanent firewall |
|
6/26/2001 |
6:45 PM |
8:15 PM |
1.5 |
Drilled and countersunk holes for bolts in same, then ground flat spots on the bolts and floxed them in |
|
6/16/2001 |
10:45 AM |
12:30 PM |
1.8 |
Cut 'glass and laid up the aft face of the permanent firewall |
|
6/14/2001 |
6:40 PM |
8:45 PM |
2.1 |
Cut holes in the permanent firewall, cut aluminum inserts for same and glued them in |
|
6/10/2001 |
8:35 PM |
8:55 PM |
0.3 |
Sanded the edges of the permanent firewall |
|
6/10/2001 |
4:50 PM |
6:00 PM |
1.2 |
Cut out and sanded the pieces of plywood for the permanent firewall |
|
6/10/2001 |
1:00 PM |
2:50 PM |
1.8 |
Cut out the temporary firewall and sanded same. Made patters for the permanent firewall |
|
6/10/2001 |
7:50 AM |
9:00 AM |
1.2 |
Mounted the landing gear bulkheads on the wall, traced the firewall on temporary plywood |
|
6/5/2001 |
6:50 PM |
8:50 PM |
2 |
Glued two pieces of plywood together for the temporary firewall, traced the firewall plans |
|
6/4/2001 |
8:00 PM |
9:10 PM |
1.2 |
Finished sanding the last of the landing gear bulkheads |
|
6/3/2001 |
8:15 PM |
9:00 PM |
0.8 |
Finished sanding 2 of 3 of the landing gear bulkheads |
|
5/18/2001 |
5:10 PM |
6:10 PM |
1 |
Trimmed the extra glass from the landing gear bulkheads and sanded |
|
5/11/2001 |
2:10 PM |
4:15 PM |
2.1 |
Laid up the aft side of same |
|
5/11/2001 |
9:30 AM |
11:15 AM |
1.8 |
Trimmed 1 side of same and prepped them for the second side layups |
|
5/10/2001 |
3:30 PM |
6:15 PM |
2.8 |
Laid up the landing gear buklheads forward side |
|
5/10/2001 |
2:30 PM |
3:00 PM |
0.5 |
Sanded, prepped and cleaned same for micro |
|
5/10/2001 |
10:45 AM |
12:45 PM |
2 |
Beveled the foam for same and cut glass for the layups |
|
5/7/2001 |
7:40 PM |
8:40 PM |
1 |
Glued the hard points into the landing gear bulkhead foam pieces |
|
4/15/2001 |
1:50 PM |
3:20 PM |
1.5 |
Laid out and cut out the landing gear bulkheads (foam parts) |