12/18/2001 |
3:00 PM |
4:15 PM |
1.2 |
Sanded extra glass, flox, foam off fuselages sides and longerons |
|
12/16/2001 |
4:20 PM |
4:40 PM |
0.3 |
Trimmed F-22 doubler |
|
11/27/2001 |
7:30 PM |
10:10 PM |
2.7 |
Cut the fuselage sides to length. Cut out the spare cutouts, sanded the sides more and mocked up F-22 for fitting |
|
11/27/2001 |
5:00 PM |
5:30 PM |
0.5 |
Sanded extra glass, micro etc. off of the fuselage sides/longerons |
|
10/29/2001 |
7:10 PM |
8:45 PM |
1.6 |
Sanded last layup edges smooth, cut extra channel, foam and layup from the aft edges and trimmed, popped sides off of jigs and cleaned lumps of foam off of the jigs |
|
10/28/2001 |
7:00 PM |
7:30 PM |
0.5 |
Knife trimmed |
|
10/28/2001 |
1:00 PM |
2:40 PM |
1.7 |
Laid up 6 layers of BID over same and peel plied |
|
10/28/2001 |
11:00 AM |
12:30 PM |
1.5 |
Sanded foam smooth second side |
|
10/28/2001 |
7:15 AM |
7:45 AM |
0.5 |
Sanded foam smooth one side |
|
10/27/2001 |
9:45 AM |
11:10 AM |
1.4 |
Microed in the foam and weighted down same |
|
10/27/2001 |
8:35 AM |
9:05 AM |
0.5 |
Fitted remaining foam over and around the electrical channels and LWX and LWY |
|
10/26/2001 |
6:50 PM |
8:30 PM |
1.7 |
Fitted and glued on electrical channel covers, glued toothpicks into holes, cut and fit clark foam for 1 side |
|
10/26/2001 |
5:00 PM |
6:00 PM |
1 |
Trimmed and sanded from the previous step, sanded off extra flox in the electrical channel |
|
10/25/2001 |
6:50 PM |
8:30 PM |
1.7 |
Floxed on stringers and added fiberglass tapes |
|
10/25/2001 |
5:30 PM |
6:00 PM |
0.5 |
Prepared for stringer layup, set up weights and for fiberglass tape |
|
10/23/2001 |
6:30 PM |
8:00 PM |
1.5 |
Drilled hole, nailed and dry mounted LWX and LWY both sides |
|
10/23/2001 |
5:15 PM |
5:45 PM |
0.5 |
Parted electrical channel covers from their molds and trimmed |
|
10/22/2001 |
6:45 PM |
7:30 PM |
0.8 |
Laminated electrical channels and covers |
|
10/22/2001 |
5:05 PM |
5:55 PM |
0.8 |
Microed electrical channels, cut glass for those and for the covers |
|
10/21/2001 |
6:30 PM |
7:00 PM |
0.5 |
Taped plugs to the workbench |
|
10/21/2001 |
4:05 PM |
5:35 PM |
1.5 |
Cut LWX and LWY, sanded to shape, made foam plugs for the electrical channel cover |
|
10/21/2001 |
6:50 AM |
7:50 AM |
1 |
Mocked up and cut out LWX and LWY, removed clamps and trimmed doublers of excess flox |
|
10/20/2001 |
4:30 PM |
5:15 PM |
0.8 |
Cut out the electrical channels |
|
10/20/2001 |
9:50 AM |
12:00 PM |
2.2 |
Manufactured the triangular longeron doublers, test fitted and floxed on, laid out spar cutout, sanded aft edge of fuselage sides, started on LWX and LWY |
|
10/13/2001 |
10:50 AM |
1:00 PM |
2.2 |
Glued the second triangular longeron and cut the triangular longeron doublers |
|
10/8/2001 |
3:30 PM |
4:15 PM |
0.8 |
Measured and prepared the second side for the triangular longeron, cut slices into longeron |
|
10/6/2001 |
4:00 PM |
6:25 PM |
2.4 |
Prepared for and glued on the triangular longeron |
|
10/6/2001 |
9:30 AM |
12:45 PM |
3.2 |
Prepared for and did the second 4 layer UNI layup |
|
10/4/2001 |
6:40 PM |
8:00 PM |
1.3 |
Sanded glass edge on 4 layer UNI layup one side, measured for triangular longerons |
|
9/27/2001 |
7:00 PM |
7:55 PM |
0.9 |
Cut spacers for laminating triangular stock and fitted same |
|
9/27/2001 |
5:05 PM |
6:05 PM |
1 |
Sanded toothpicks off smooth and sanded saw cuts I filled with 5 min |
|
9/25/2001 |
6:50 PM |
8:30 PM |
1.7 |
Rough trimmed that layup, cut glass for the other side and glued toothpicks into holes |
|
9/23/2001 |
3:30 PM |
5:45 PM |
2.2 |
Re-did the 4 layer UNI layup on the first side |
|
9/17/2001 |
7:00 PM |
8:00 PM |
1 |
Sanded rounded edge on longerons and prepared for re-do of the first layup |
|
9/9/2001 |
1:30 PM |
6:00 PM |
4.5 |
Heat delaminated the rest of same and sanded smooth |
|
9/8/2001 |
10:30 AM |
12:30 PM |
2 |
De-laminated with a heat gun about half of the same |
|
8/19/2001 |
1:30 PM |
7:30 PM |
|