5/11/2002 |
8:20 PM |
9:40 PM |
1.3 |
De-bubbled same and peel plied |
|
5/11/2002 |
4:20 PM |
6:20 PM |
2 |
Did 2 BID tapes for fuselage bottom |
|
5/11/2002 |
1:50 PM |
3:30 PM |
1.7 |
Sanded more cut glass for tapes |
|
5/11/2002 |
11:35 AM |
12:45 PM |
1.2 |
Sanded longerons for BID tapes |
|
5/10/2002 |
7:30 PM |
9:10 PM |
1.7 |
Built A frames and installed fuselage on same |
|
5/5/2002 |
10:10 AM |
12:00 PM |
1.8 |
Built A frames |
|
5/4/2002 |
4:30 PM |
6:00 PM |
1.5 |
Built A frames |
|
4/27/2002 |
7:15 PM |
7:45 PM |
0.5 |
Checked fillets and cleaned up |
|
4/27/2002 |
2:00 PM |
6:00 PM |
4 |
Floxed on fuselage bottom & made flox fillets |
|
4/27/2002 |
9:35 AM |
12:05 PM |
2.5 |
Test fit bottom on fuselage, sanded aft edge, assembled weights & boards for floxing on same |
|
4/20/2002 |
10:30 AM |
2:50 PM |
4.3 |
Put on BID |
|
4/20/2002 |
7:15 AM |
10:00 AM |
2.8 |
Microed fuselage bottom for BID layup |
|
4/19/2002 |
7:20 PM |
8:25 PM |
1.1 |
Finished sanding same, test fit and cleaned up |
|
4/16/2002 |
8:00 PM |
9:15 PM |
1.2 |
Microed remaining foam spacers on |
|
4/14/2002 |
3:50 PM |
5:15 PM |
1.4 |
Microed on more foam spacers |
|
4/2/2002 |
7:00 PM |
8:00 PM |
1 |
Microed on key foam spacers |
|
3/31/2002 |
9:30 AM |
2:00 PM |
4.5 |
More foam spacers, ready for micro |
|
3/30/2002 |
2:30 PM |
4:00 PM |
1.5 |
More work on foam spacers, cut out landing brake |
|
3/30/2002 |
9:45 AM |
12:30 PM |
2.8 |
Finished jig, moved foam to workbench, started on foam spacers |
|
3/30/2002 |
9:00 AM |
9:45 AM |
0.8 |
Re-leveled fuselage |
|
3/29/2002 |
6:00 PM |
6:30 PM |
0.5 |
Re-leveled fuselage |
|
3/29/2002 |
8:50 AM |
12:20 PM |
3.5 |
Built jig for fuselage bottom, re-leveled fuse on jig |
|
3/24/2002 |
1:30 PM |
3:45 PM |
2.2 |
Glued together 3x pieces 3/8 PVC foam, marked same, trimmed same for fuselage bottom |
|
3/24/2002 |
8:10 AM |
8:30 AM |
0.3 |
Removed clamps, peel ply and etc. from same |
|
3/23/2002 |
12:45 PM |
3:35 PM |
2.8 |
Floxed in heat duct and FSBB & did 2 BID tapes on same |
|
3/23/2002 |
9:05 AM |
12:00 PM |
2.9 |
Sanded for heat duct and FSBB flox and layup, made jigs to clamp & cut fiberglass |
|
3/16/2002 |
1:15 PM |
3:05 PM |
1.8 |
Cut holes and sanded same in FSB for fuel valve to penetrate FSB |
|
3/16/2002 |
11:40 AM |
12:30 PM |
0.8 |
Trimmed and sanded heat duct and FSBB and fitted into fuselage |
|
3/14/2002 |
5:15 AM |
5:45 AM |
0.5 |
Scissor trimmed same |
|
3/13/2002 |
6:40 PM |
10:30 PM |
3.8 |
Did 2 BID layups on heat duct and FSBB, BID taped together, peel plied |
|
3/12/2002 |
7:30 PM |
8:30 PM |
1 |
Floxed 2" aluminum tube into FSBB and finished jig for the heat duct |
|
3/12/2002 |
5:45 PM |
6:15 PM |
0.5 |
Made jig for heat duct layup |
|
3/11/2002 |
7:30 PM |
8:30 PM |
1 |
Sanded and fitted the heat duct and FSBB and cut holes in the FSB for same |
|
3/10/2002 |
1:50 PM |
3:50 PM |
2 |
Adjusted heat duct, floxed on the lower firewall |
|
3/9/2002 |
9:55 AM |
12:30 PM |
2.6 |
Trimmed electrical ducts, test fit & trimmed FSBB and heat duct, cut some holes in FSB for same |
|
3/7/2002 |
7:30 PM |
8:30 PM |
1 |
2 BID layup on expanded electrical duct (close to aft end by lower firewall) |
|
3/2/2002 |
2:50 PM |
6:15 PM |
3.4 |
Did 7 UNI layup on heat duct, assembled SB support, floxed and BID taped same |
|
3/2/2002 |
11:00 AM |
|