5/11/2002 |
8:20 PM |
9:40 PM |
1.3 |
De-bubbled same and peel plied |
|
5/11/2002 |
4:20 PM |
6:20 PM |
2 |
Did 2 BID tapes for fuselage bottom |
|
5/11/2002 |
1:50 PM |
3:30 PM |
1.7 |
Sanded more cut glass for tapes |
|
5/11/2002 |
11:35 AM |
12:45 PM |
1.2 |
Sanded longerons for BID tapes |
|
5/10/2002 |
7:30 PM |
9:10 PM |
1.7 |
Built A frames and installed fuselage on same |
|
5/5/2002 |
10:10 AM |
12:00 PM |
1.8 |
Built A frames |
|
5/4/2002 |
4:30 PM |
6:00 PM |
1.5 |
Built A frames |
|
4/27/2002 |
7:15 PM |
7:45 PM |
0.5 |
Checked fillets and cleaned up |
|
4/27/2002 |
2:00 PM |
6:00 PM |
4 |
Floxed on fuselage bottom & made flox fillets |
|
4/27/2002 |
9:35 AM |
12:05 PM |
2.5 |
Test fit bottom on fuselage, sanded aft edge, assembled weights & boards for floxing on same |
|
4/20/2002 |
10:30 AM |
2:50 PM |
4.3 |
Put on BID |
|
4/20/2002 |
7:15 AM |
10:00 AM |
2.8 |
Microed fuselage bottom for BID layup |
|
4/19/2002 |
7:20 PM |
8:25 PM |
1.1 |
Finished sanding same, test fit and cleaned up |
|
4/16/2002 |
8:00 PM |
9:15 PM |
1.2 |
Microed remaining foam spacers on |
|
4/14/2002 |
3:50 PM |
5:15 PM |
1.4 |
Microed on more foam spacers |
|
4/2/2002 |
7:00 PM |
8:00 PM |
1 |
Microed on key foam spacers |
|
3/31/2002 |
9:30 AM |
2:00 PM |
4.5 |
More foam spacers, ready for micro |
|
3/30/2002 |
2:30 PM |
4:00 PM |
1.5 |
More work on foam spacers, cut out landing brake |
|
3/30/2002 |
9:45 AM |
12:30 PM |
2.8 |
Finished jig, moved foam to workbench, started on foam spacers |
|
3/30/2002 |
9:00 AM |
9:45 AM |
0.8 |
Re-leveled fuselage |
|
3/29/2002 |
6:00 PM |
6:30 PM |
0.5 |
Re-leveled fuselage |
|
3/29/2002 |
8:50 AM |
12:20 PM |
3.5 |
Built jig for fuselage bottom, re-leveled fuse on jig |
|
3/24/2002 |
1:30 PM |
3:45 PM |
2.2 |
Glued together 3x pieces 3/8 PVC foam, marked same, trimmed same for fuselage bottom |
|
3/24/2002 |
8:10 AM |
8:30 AM |
0.3 |
Removed clamps, peel ply and etc. from same |
|
3/23/2002 |
12:45 PM |
3:35 PM |
2.8 |
Floxed in heat duct and FSBB & did 2 BID tapes on same |
|
3/23/2002 |
9:05 AM |
12:00 PM |
2.9 |
Sanded for heat duct and FSBB flox and layup, made jigs to clamp & cut fiberglass |
|
3/16/2002 |
1:15 PM |
3:05 PM |
1.8 |
Cut holes and sanded same in FSB for fuel valve to penetrate FSB |
|
3/16/2002 |
11:40 AM |
12:30 PM |
0.8 |
Trimmed and sanded heat duct and FSBB and fitted into fuselage |
|
3/14/2002 |
5:15 AM |
5:45 AM |
0.5 |
Scissor trimmed same |
|
3/13/2002 |
6:40 PM |
10:30 PM |
3.8 |
Did 2 BID layups on heat duct and FSBB, BID taped together, peel plied |
|
3/12/2002 |
7:30 PM |
8:30 PM |
1 |
Floxed 2" aluminum tube into FSBB and finished jig for the heat duct |
|
3/12/2002 |
5:45 PM |
6:15 PM |
0.5 |
Made jig for heat duct layup |
|
3/11/2002 |
7:30 PM |
8:30 PM |
1 |
Sanded and fitted the heat duct and FSBB and cut holes in the FSB for same |
|
3/10/2002 |
1:50 PM |
3:50 PM |
2 |
Adjusted heat duct, floxed on the lower firewall |
|
3/9/2002 |
9:55 AM |
12:30 PM |
2.6 |
Trimmed electrical ducts, test fit & trimmed FSBB and heat duct, cut some holes in FSB for same |
|
3/7/2002 |
7:30 PM |
8:30 PM |
1 |
2 BID layup on expanded electrical duct (close to aft end by lower firewall) |
|
3/2/2002 |
2:50 PM |
6:15 PM |
3.4 |
Did 7 UNI layup on heat duct, assembled SB support, floxed and BID taped same |
|
3/2/2002 |
11:00 AM |
12:30 PM |
1.5 |
Trimmed foam where fuel valve plywood inserts go, drilled holes, fitted and sanded same |
|
3/2/2002 |
7:30 AM |
8:30 AM |
1 |
Beveled spacers for triangular seat back brace and 5-minute epoxied together |
|
2/28/2002 |
6:30 PM |
8:00 PM |
1.5 |
Rounded corners on heat duct, made slot for tube and floxed tube into slot |
|
2/28/2002 |
4:45 PM |
5:30 PM |
0.8 |
Rounded corners on plywood inserts, mixed flox, prepared foam triangles for plywood inserts |
|
2/25/2002 |
6:40 PM |
8:00 PM |
1.3 |
Trimmed and drilled fuel valve mounting fixture and mounted nutserts in same |
|
2/24/2002 |
2:10 PM |
3:10 PM |
1 |
Made fixture; on same did 6 PLY layup for fuel valve mount (vice aluminum) |
|
2/24/2002 |
7:30 AM |
8:00 AM |
0.5 |
Removed same from fixture and cleaned up |
|
2/23/2002 |
1:25 PM |
2:35 PM |
1.2 |
Floxed together heat duct parts |
|
2/23/2002 |
10:40 AM |
12:40 PM |
2 |
Started assembling heat duct |
|
2/7/2002 |
7:40 PM |
9:10 PM |
1.5 |
Cut holes in lower firewall and began fitting to fuselage |
|
2/7/2002 |
7:10 PM |
7:40 PM |
0.5 |
Opened 1/4" torque tube holes in same |
|
2/6/2002 |
6:55 PM |
9:50 PM |
2.9 |
Did 6 UNI and 2 BID layups on the aft side of the FLGBH |
|
2/5/2002 |
7:00 PM |
8:55 PM |
1.9 |
Sanded ALGBH and cut fiberglass and made pattern for the next layup |
|
2/5/2002 |
5:15 PM |
5:30 PM |
0.2 |
Cleaned up same |
|
2/4/2002 |
8:10 PM |
9:05 PM |
0.9 |
Opened up torque tube holes in LGBHs and stated sanding FLGBH for layups |
|
2/2/2002 |
5:00 PM |
5:40 PM |
0.7 |
Cut out plywood insert for fuel valve in seat back brace |
|
1/27/2002 |
9:00 PM |
10:00 PM |
1 |
Knife trimmed same, turned fuselage over and re-drilled LGBH holes |
|
1/27/2002 |
1:30 PM |
4:20 PM |
2.8 |
Microed and laminated same - triangles 2 BID heat duct 2 UNI |
|
1/26/2002 |
7:30 PM |
9:10 PM |
1.7 |
Marked and cut out foam for seatback brace and heat duct |
|
1/26/2002 |
12:45 PM |
3:00 PM |
2.2 |
Sanded for and installed 3 UNI and 2 BID tape layups on FLGBH |
|
1/26/2002 |
11:00 AM |
12:00 PM |
1 |
Cut glass for BID tapes and 3 UNI layup on front of FLGBH |
|
1/25/2002 |
7:00 PM |
10:30 PM |
3.5 |
BID taped in F-28, floxed in the top of the FLGBH |
|
1/24/2002 |
6:45 PM |
9:00 PM |
2.2 |
Syringe epoxy filled bubbles on BID tapes in the whole aircraft |
|
1/22/2002 |
6:30 PM |
7:30 PM |
1 |
Trimmed BID tapes for same |
|
1/20/2002 |
11:30 AM |
5:30 PM |
6 |
Floxed in F-28, BID tapes on front and aft LGBH |
|
1/19/2002 |
7:35 PM |
8:20 PM |
0.8 |
Floxed in FLGBH |
|
1/19/2002 |
12:15 PM |
1:30 PM |
1.2 |
Fnished same, sanded that and ALGBH |
|
1/19/2002 |
11:00 AM |
11:30 AM |
0.5 |
More mount prep for FLGBH |
|
1/19/2002 |
7:00 AM |
9:30 AM |
2.5 |
Drilled holes in ALGBH, FLGBH top for torque tubes, started work on fixture for FLGBH bottom |
|
1/16/2002 |
6:45 PM |
7:35 PM |
0.8 |
Floxed aft side of aft landing gear bulkhead |
|
1/5/2002 |
2:30 PM |
3:00 PM |
0.5 |
Floxed in forward face of aft landing gear bulkhead |
|
1/5/2002 |
9:25 AM |
11:25 AM |
2 |
Made blocks and test fit the aft landing gear bulkhead |
|
1/3/2002 |
5:15 PM |
6:00 PM |
0.8 |
Test fit F-28 in its new, proper position |
|
1/2/2002 |
8:05 PM |
8:45 PM |
0.7 |
Test fitted and adjusted new F-28, sanded w/36 grit and made a mount for installation of same |
|
12/28/2001 |
3:20 PM |
5:30 PM |
2.2 |
Did 4 ply layup aft of F-22 (under canard) |
|
12/27/2001 |
9:15 AM |
12:50 PM |
3.6 |
Did fiberglass tapes on fuselage bulkheads |
|
12/27/2001 |
8:30 AM |
9:00 AM |
0.5 |
Laid out glass for fiberglass tapes |
|
12/26/2001 |
3:15 PM |
5:30 PM |
2.2 |
Picked out glass, laid out tapes needed, cut peel ply and re-leveled fuselage |
|
12/26/2001 |
1:00 PM |
2:00 PM |
1 |
Scraped glue off table and sanded, stowed fuselage jigs |
|
12/26/2001 |
8:15 AM |
8:40 AM |
0.4 |
Removed fuselage side jigs from jig table |
|
12/24/2001 |
12:15 PM |
1:15 PM |
1 |
Sanded same for fiberglass tapes |
|
12/21/2001 |
2:50 PM |
6:00 PM |
3.2 |
Floxed fuselage together, made flox fillets at all joints and cleaned up |
|
12/21/2001 |
1:40 PM |
2:10 PM |
0.5 |
Prepared for floxing fuselage bulkheads |
|
12/19/2001 |
7:10 PM |
8:50 PM |
1.7 |
Sanded all mating surfaces, cleaned and vacuumed |
|
12/19/2001 |
1:15 PM |
6:00 PM |
4.8 |
Made more clamping wood pieces, re-leveled jig, leveled and installed sides, nailed FSB |
|
12/19/2001 |
12:00 PM |
12:30 PM |
0.5 |
Clamped front seatback into place |
|
12/16/2001 |
6:45 PM |
7:55 PM |
1.2 |
Test fitted and clamped F-22 and nailed into place |
|
12/16/2001 |
4:45 PM |
6:00 PM |
1.2 |
Marked placement of front seatback and instrument panel on fuselage sides |
|
12/16/2001 |
4:40 PM |
6:10 PM |
1.5 |
Assembled fuselage on jig, test fitted and drilled F-22 |
|
12/16/2001 |
3:45 PM |
4:20 PM |
0.6 |
Added two legs to my fuselage assembly jig |
|
12/14/2001 |
7:30 PM |
9:30 PM |
2 |
Built 2x4 doublers and installed, mounted temporary firewall and sides to same for test fitting |
|
12/13/2001 |
7:50 PM |
8:35 PM |
0.8 |
Ditto other side |
|
11/30/2001 |
7:30 PM |
8:55 PM |
1.4 |
Test fit and sanded F22, FSB, IP and sanded same to fit one side |
|
11/29/2001 |
6:30 PM |
8:15 PM |
1.8 |
Test fit bulkheads to fuselage sides |
|
11/29/2001 |
5:00 PM |
5:45 PM |
0.8 |
Checked fit and adjusted F22 and temporary firewall |
|
11/20/2001 |
7:00 PM |
8:10 PM |
1.2 |
Cleaned up |
|
11/20/2001 |
1:20 PM |
4:10 PM |
2.8 |
Finished above except for the 2x4 doubled cross members |
|
11/20/2001 |
9:45 AM |
11:10 AM |
1.4 |
Started building the fuselage assembly jig |