Fuselage Exterior
Up NACA Scoop Contour Bottom Glass Bottom Contour Sides Glass Sides

 

 
Overall totals for Chapter 7
Start Finish Hours Sessions

5/31/2002

1/16/2003

111.6

53

 
Detail of Sessions Worked
Date Start Finish Hours Work Performed

1/16/2003

5:50 PM

7:10 PM

1.3

Did the long 3 layer UNI layup

1/14/2003

6:55 PM

8:00 PM

1.1

Sanded and did the prep work for the 3 layer UNI layup - long

1/12/2003

8:10 PM

8:50 PM

0.7

Cut glass for the 3 UNI do-over and cleaned up, knife trimmed previous layup

1/12/2003

1:25 PM

4:05 PM

2.7

Did same for the other side, but did the 3 UNI long layup on the jig table. When we moved it to the plane it slid off so far I couldn't fix it and it went in the trash. Peel plied the spot it was on and did the 3 UNI 2 BID on the FW & LDGBH

1/11/2003

1:15 PM

5:30 PM

4.2

Did omitted layups, one side

1/11/2003

9:35 AM

12:20 PM

2.8

Cleaned up & sanded places for omitted layups as mentioned above

1/5/2003

2:00 PM

5:45 PM

3.8

Did the other side with Kelly, omitted same layups

1/2/2003

1:30 PM

6:30 PM

5

Did 1 side UNI layup (with Kelly) - peel plied for but didn't do 3 UNI long layup on side, 3 UNI & 2 BID layups on landing gear bulkheads and firewall

1/1/2003

3:00 PM

5:00 PM

2

Sanded longerons & fuel windows and made fuel window boards

1/1/2003

10:10 AM

12:40 PM

2.5

Leveled jig table & sanded fuselage sides for the next layup

12/30/2002

3:30 PM

5:45 PM

2.2

Marked & drilled holes to fill bubbles and filled

12/28/2002

1:15 PM

2:45 PM

1.5

Trimmed bottom layup edges

12/27/2002

11:00 AM

12:30 PM

1.5

Same

12/27/2002

9:30 AM

10:30 AM

1

Building new rotisserie ends

12/26/2002

2:00 PM

3:45 PM

1.8

Shortened rotisserie legs

12/23/2002

3:45 PM

11:30 PM

7.8

Did fuselage bottom layup - half hour break for dinner at 18:00 - I am exhausted!

12/23/2002

1:20 PM

3:30 PM

2.2

Cut peel ply, taped areas and readied for layup

12/21/2002

3:30 PM

5:30 PM

2

Microed antenna and re-did tape around the landing brake

12/21/2002

1:30 PM

3:00 PM

1.5

Sanded and vacuumed foam and microed

12/21/2002

10:00 AM

12:25 PM

2.4

Made foam pieces to repair gouges, leveled fuselage and made fiberglass straighteners

12/21/2002

7:00 AM

9:00 AM

2

Final re-installed marker beacon antenna & sanded edges of NACA scoop

12/19/2002

7:00 PM

9:00 PM

2

Installed marker beacon

12/18/2002

9:00 PM

9:30 PM

0.5

Measured for antenna (marker beacon)

12/15/2002

4:00 PM

6:00 PM

2

Sanded corners of landing gear bulkhead & F22 for UNI layups

12/14/2002

7:00 AM

7:30 AM

0.5

Removed jigs & peel ply from same

12/13/2002

6:30 PM

9:30 PM

3

Glassed NACA scoop

12/12/2002

7:30 PM

8:30 PM

1

Prepared for next layup, cut peel ply, filled epoxy pump & laid plastic

11/30/2002

2:45 PM

4:30 PM

1.8

Left side top - carved and sanded

11/27/2002

9:40 AM

12:10 PM

2.5

Carved round upper corner of fuselage R side top and sanded

8/3/2002

1:00 PM

4:00 PM

3

Made templates for top round fuselage corners, cleaned up

7/21/2002

6:45 PM

8:10 PM

1.4

Did same on the other side

7/21/2002

5:00 PM

6:00 PM

1

Carved foam off outside of fuel gauge

7/16/2002

7:15 PM

9:00 PM

1.8

Sanded wood for step, duct taped around landing brake, double-sided taped same on

7/6/2002

1:15 PM

3:25 PM

2.2

Microed in wood for step, routed & finished up joggle

7/6/2002

10:15 AM

12:20 PM

2.1

Routed 1/16" depression corners on F-22

7/6/2002

8:45 AM

9:35 AM

0.8

Routed 1/16" depresion around F-22 flat spots only

7/5/2002

8:30 PM

10:00 PM

1.5

Routed 1/16" depression around belly board