|
4/1/2003 |
6:54 PM |
8:33 PM |
1.6 |
Drilled 8 holes and counterbored the outside of 6 holes for the outside seat belt attachments at all spots except for the step. |
|
3/22/2003 |
1:51 PM |
4:28 PM |
2.6 |
Floxed in and then laid glass over the outside seat belt attachments, 4 of them |
|
3/22/2003 |
10:11 AM |
12:40 PM |
2.5 |
Sanded inside of fuselage with 36 grit for install of outside seat belt attachments, cut glass for layup of same, re-marked fuselage for same |
|
3/22/2003 |
8:00 AM |
9:01 AM |
1 |
Measured for outside seat belt attachments, cleaned and sanded aluminum parts for same |
|
3/8/2003 |
1:49 PM |
3:14 PM |
1.4 |
Did the 7 layer BID/UNI alternating layup over the front seat heat duct seat belt attachment. |
|
3/8/2003 |
11:12 AM |
12:51 PM |
1.6 |
Ordered bolts from Bell Helicopter and did the 7-layer BID/UNI alternating layup over the aft seat heat duct seat belt attach point. |
|
3/6/2003 |
6:39 PM |
8:23 PM |
1.7 |
Sanded bottom of fuselage, top & sides of heat ducts fore & aft, cut glass for layup over same and made wax paper templates for layups. |
|
3/4/2003 |
6:17 PM |
8:21 PM |
2.1 |
Inventoried parts trying to determine what is missing in Chapter 8. Bagged same in chapter groups. |
|
3/1/2003 |
10:03 AM |
12:33 PM |
2.5 |
Floxed in the aft seat duct, BID taped same, peel plied tapes. |
|
2/27/2003 |
6:10 PM |
8:09 PM |
2 |
Sanded the aft seat heat duct for a good fit on the fuselage bottom, 36 grit sanded the bottom and edges of the heat duct and cut glass for the tapes to install same. |
|
2/25/2003 |
7:00 PM |
8:30 PM |
1.5 |
Cut a hole in the aft seat heat duct for the transition piece, sanded it to fit same and installed same with flox. |
|
2/23/2003 |
1:05 PM |
4:00 PM |
2.9 |
Did 2 BID layup over aft seat heat duct. |
|
2/22/2003 |
11:18 AM |
1:13 AM |
1.9 |
Made aluminum pieces for outside seat belt attachments. |
|
2/18/2003 |
7:23 PM |
8:23 PM |
1 |
Made wood pieces for outside seat belt attachments. |
|
2/15/2003 |
2:26 PM |
5:55 PM |
3.5 |
Prepared for and did the 3 layer UNI layup over the shoulder brace for the harness mounts |
|
2/15/2003 |
11:40 AM |
12:37 PM |
0.9 |
Trimmed and sanded shoulder brace layup from prior step. Rounded over with router aft top edge of same. |
|
2/9/2003 |
12:27 PM |
1:50 PM |
1.4 |
Did 2 ply BID layup over on shoulder brace |
|
2/9/2003 |
11:23 AM |
12:17 PM |
0.9 |
Cut glass for and microed for 2 BID layup on shoulder brace do over |
|
2/4/2003 |
7:04 PM |
8:55 PM |
1.9 |
Did 2 BID layup on transition piece, 7 layer UNI layup on aft seat heat duct |
|
2/3/2003 |
8:09 PM |
9:04 PM |
0.9 |
Routed corner on aft heat duct, glued in seat belt mount tube and finished taping transition piece |
|
2/2/2003 |
10:05 AM |
12:50 PM |
2.8 |
Made urethane foam for transition piece (3 times) carved heat duct for tubing |
|
2/1/2003 |
3:59 PM |
5:30 PM |
1.5 |
Assembled aft seat heat duct and started on the foam for the transition piece |
|
2/1/2003 |
11:05 AM |
12:57 PM |
1.9 |
Cut out aft seat heat duct parts, cut bottoms to match fuselage sides and test assembled same |
|
1/31/2003 |
7:05 PM |
9:08 PM |
2 |
Heat stripped 2 BID layup off of shoulder brace and sanded same smooth. |
|
1/29/2003 |
6:23 PM |
8:25 PM |
2 |
Did the 2-layer BID layup over the shoulder brace and peel plied. |
|
1/29/2003 |
5:02 PM |
5:58 PM |
0.9 |
Sanded, cut glass and prepared for 2 BID layup on shoulder brace |
|
1/26/2003 |
7:28 PM |
8:27 PM |
1 |
Installed shoulder brace; installed bolts and wet out edges of previous layup, peel plied edges |
|
1/26/2003 |
1:23 PM |
4:36 PM |
3.2 |
Finished prepping shoulder brace and did 1 BID layup over same |
|
1/26/2003 |
10:56 AM |
12:35 PM |
1.6 |
Epoxied shoulder brace and top together and fitted into fuselage. Made jig to hold when glassing. Sanded interior of fuselage and seat back. |
|
1/26/2003 |
7:26 AM |
9:13 AM |
1.8 |
Widened slots in shoulder brace front, glued to top, routed corner on same, test fit |
|
1/25/2003 |
9:20 AM |
1:00 PM |
3.7 |
Made new shoulder brace top, installed 1/4" plywood inserts, made & installed glass inserts, glassed heat duct parts |
|
1/23/2003 |
5:00 PM |
5:30 PM |
0.5 |
Drilled fiberglass on shoulder brace top and broke it in half! |
|
1/22/2003 |
6:50 PM |
8:20 PM |
1.5 |
BID layups for shoulder harness mounts |
|
1/19/2003 |
11:00 AM |
12:30 PM |
1.5 |
Drilled holes in plywood inserts in should brace top, other chapter 8 work |
|
1/18/2003 |
9:50 AM |
1:20 PM |
3.5 |
Made the shoulder brace front and top |