1/22/2005 |
2:41 PM |
5:28 PM |
2.8 |
Added micro to sides of landing brake actuator mount, prepared same & installed with 1 ply BID |
|
1/9/2005 |
11:25 AM |
12:55 PM |
1.5 |
Un-bolted axles from MLG strut, removed packing tape from same and re-assembled including brake assemblies |
|
1/8/2005 |
7:02 PM |
8:35 PM |
1.5 |
Floxed axles onto MLG strut; adjusted same for correct toe-in |
|
1/8/2005 |
10:56 AM |
1:00 PM |
2.1 |
Sanded MLG strut ends, made new circular backing plates and readied all for floxing on axles |
|
1/8/2005 |
8:28 AM |
10:00 AM |
1.5 |
Disassembled wheels, brakes and calipers, re-leveled fuselage and set up laser for floxing axles to MLG strut |
|
1/6/2005 |
6:37 PM |
9:13 PM |
2.6 |
Finished trimming MLG strut to clear brake calipers, reinstalled same in fuselage, test fitted and trimmed aluminum backing plates and re-assembled entire wheel and brake assembly on strut |
|
1/5/2005 |
6:08 PM |
10:08 PM |
4 |
Finished drilling holes in MLG strut for axle installation, then trimmed excess strut beyond axle mount with hacksaw, Fein, file, etc. and test fitted brake calipers |
|
1/4/2005 |
7:08 PM |
8:30 PM |
1.4 |
Drilled holes in one gear leg for the axle, test fitted same |
|
1/3/2005 |
7:01 AM |
7:22 AM |
0.4 |
Un-clamped & removed peel ply from previous layup, cleaned up |
|
1/2/2005 |
1:05 PM |
1:33 PM |
0.5 |
Clamped the axle mounting pad layup and adjusted until laser sighted at 1/4 degree toe in |
|
1/2/2005 |
9:40 AM |
12:21 PM |
2.7 |
Finished jigging fuselage for the axle pad 3 BID layup and applied same; will add boards and clamps in about an hour |
|
1/1/2005 |
4:03 PM |
5:04 PM |
1 |
Leveled fuselage, hung plumb bobs and started laying out laser sighting arrangement for axle alignment |
|
1/1/2005 |
9:29 AM |
12:41 PM |
3.2 |
Made jigs for marking the landing gear struts for the axles and brakes & made the .063" aluminum backing plates |
|
12/19/2004 |
6:49 AM |
7:39 AM |
0.8 |
Removed the peel ply and bagging materials from the landing brake and re-installed same |
|
12/18/2004 |
2:17 PM |
6:15 PM |
4 |
Did the 3 BID layup on the bottom of the landing brake via vacuum bagging method |
|
11/14/2004 |
2:49 PM |
5:57 PM |
3.1 |
Sanded minor bumps from previous layup and started install of landing brake actuator bracket |
|
11/13/2004 |
9:24 AM |
1:35 PM |
4.2 |
Prepared for and did the 3 BID layup on the bottom of the fuselage where the landing brake stows |
|
11/9/2004 |
6:15 PM |
6:45 PM |
0.5 |
Sanded foam on inside of landing brake recess |
|
11/3/2004 |
6:51 PM |
9:12 PM |
2.3 |
Enlarged hole in fuselage bottom for landing brake actuator, test installed actuator test ran same - moving parts! |
|
11/2/2004 |
5:45 PM |
9:18 PM |
3.5 |
Routed more foam from under landing brake, started installation of LB-19s and linear actuator |
|
10/31/2004 |
1:17 PM |
4:06 PM |
2.8 |
Routed foam 1/8" deep below landing brake, sanded same smooth |
|
10/30/2004 |
3:42 PM |
6:04 PM |
2.4 |
Finished cutting landing brake actuator bracket; started cutting foam below landing brake to size |
|
10/27/2004 |
7:21 PM |
9:15 PM |
1.9 |
Made a landing brake linear actuator bracket from 4 10 ply layups |
|
10/26/2004 |
7:39 PM |
9:33 PM |
1.9 |
Made foam parts for landing brake actuator bracket layup |
|
10/23/2004 |
1:19 PM |
4:03 PM |
2.7 |
Continued designing a LB actuator bracket |
|
10/23/2004 |
9:20 AM |
12:37 PM |
3.3 |
Microed LB-23 into fuselage, made CZLB-1 brackets and started designing a braket for the electric LB actuator |
|
10/22/2004 |
6:43 PM |
8:48 PM |
2.1 |
Test fitted assembly into fuselage, then floxed LB-19 into landing brake, repaired some damaged foam on the back of same and sanded lumps from border of recess for same |
|
10/22/2004 |
5:08 PM |
6:01 PM |
0.9 |
Epoxied aluminum slugs to LB-23 and LB-19 and hinge assembly with shims to same |
|
10/19/2004 |
6:40 PM |
9:13 PM |
2.5 |
Trimmed hinge to length, epoxied LB-19 to hinge, cut foam on back of landing brake, cut slot for LB-23 and test installed all together in fuselage |
|
10/17/2004 |
7:59 PM |
8:59 PM |
1 |
Sanded back of landing brake and cleaned stuck foam from inside of recess for same |
|
10/12/2004 |
7:42 PM |
9:04 PM |
1.4 |
Made LB-19 and LB-23 for the landing brake |
|
10/9/2004 |
9:42 AM |
1:02 PM |
3.3 |
Removed landing gear cover from fuselage and saran wrap, trimmed and sanded edges, re-marked holes, drilled holes, tapped aluminum slugs and countersunk cover, re-installed for test fit |
|
10/8/2004 |
7:31 PM |
10:13 PM |
2.7 |
Did the 2 BID tape and 1 BID overall layup on the bottom of the landing gear cover, scissor trimmed and installed over plastic wrap in the fuselage |
|
10/8/2004 |
4:46 PM |
6:05 PM |
1.3 |
Re-installed MLG strut and trimmed landing gear cover to fit around same |
|
10/7/2004 |
9:00 PM |
9:55 PM |
0.9 |
Sanded the bottom of the landing gear cover |
|
10/3/2004 |
1:17 PM |
4:37 PM |
3.3 |
Did the 2 BID layup on the landing gear cover |
|
10/3/2004 |
|