9/6/2006 |
7:33 PM |
9:26 PM |
1.9 |
Shur-form planed and sanded the last layups to conform with the tip fairings and weight recesses, re-installed the elevators and store the canard/elevator assembly overhead |
|
9/4/2006 |
1:56 PM |
5:49 PM |
3.9 |
Did the 1 ply BID layups in the weight recesses and end of the tip fairings, installed the pitch trim bellcrank, the CZ-12 weights, checked the elevators for nose-down balance and cleaned up |
|
8/23/2006 |
6:18 PM |
7:35 PM |
1.3 |
Made templates for 1 BID layup and microed tip fairings |
|
8/21/2006 |
7:08 PM |
8:21 PM |
1.2 |
Finished cutting the second weight recess and microed some curve cut foam in the back of both |
|
8/21/2006 |
5:35 PM |
6:00 PM |
0.4 |
Cut the second elevator weight recess |
|
8/20/2006 |
4:20 PM |
5:53 PM |
1.6 |
Finished cutting one elevator weight recess |
|
8/20/2006 |
9:50 AM |
11:37 AM |
1.8 |
Made elevator weight mimic jig and started cutting recesses for elevator weights |
|
8/19/2006 |
7:41 AM |
8:48 AM |
1.1 |
Removed peel ply from the elevator weights and marked the canard for slots for same |
|
8/18/2006 |
12:35 PM |
4:53 PM |
4.3 |
Finished making foam pieces for the elevator lead weights, did the 2 ply UNI layup, peel plied, vacuum bagged and cleaned up |
|
8/18/2006 |
9:35 AM |
11:37 AM |
2 |
Made the foam inserts for the elevator weights and glued them to the lead and elevators |
|
8/17/2006 |
6:31 PM |
7:38 PM |
1.1 |
Sanded carbon fiber tubes on tip fairings |
|
8/16/2006 |
6:40 PM |
7:07 PM |
0.4 |
Microed carbon fiber tubes into tip fairings |
|
8/16/2006 |
4:09 PM |
5:58 PM |
1.8 |
Cut slots for tubes in tip fairings & Dremel cut slots for flox corner |
|
8/14/2006 |
6:30 PM |
7:45 PM |
1.3 |
Removed the vacuum bag, peel ply and Shurform plane trimmed the tip fairings |
|
8/13/2006 |
12:41 PM |
2:29 PM |
1.8 |
Did the 2 ply UNI layup on the bottoms of the tip fairings, peel plied, vacuum bagged and cleaned up |
|
8/13/2006 |
9:58 AM |
11:45 AM |
1.8 |
Sanded the tip fairings and cut glass for the bottom side layups |
|
8/6/2006 |
1:32 PM |
4:39 PM |
3.1 |
Did the 2 UNI, top, tip fairing layup on both tip fairings, vacuum bagged and cleaned up |
|
7/17/2006 |
3:57 PM |
4:33 PM |
0.6 |
Glued some broken tip foam back on and microed nail gouges in same |
|
7/11/2006 |
3:25 PM |
5:15 PM |
1.8 |
Did a vacuum bag test of the canard - works great - no distortion of the tip fairings |
|
7/9/2006 |
2:15 PM |
5:20 PM |
3.1 |
Carved and sanded the new/second set of tip fairings |
|
7/7/2006 |
1:37 PM |
3:37 PM |
2 |
Sawed off old canard tips, made new foam blanks and microed those on |
|
5/13/2006 |
11:01 AM |
12:13 PM |
1.2 |
Sanded micro slot for second hinge pin and cleaned up |
|
5/10/2006 |
4:35 PM |
5:22 PM |
0.8 |
Sanded the first micro slot and made a second for the hinge pins through the canard tips |
|
5/9/2006 |
6:50 PM |
9:13 PM |
2.4 |
Finished (almost) sanding and shaping canard tips and microed one hinge slot |
|
5/7/2006 |
8:45 AM |
10:22 AM |
1.6 |
Continued sanding & shaping canard tips |
|
5/4/2006 |
6:50 PM |
8:23 PM |
1.5 |
Shaped & sanded canard tips |
|
5/3/2006 |
7:09 PM |
8:41 PM |
1.5 |
Carved and sanded the top of one canard tip |
|
4/30/2006 |
12:03 PM |
1:42 PM |
1.6 |
Microed extra foam pieces onto canard tips |
|
4/29/2006 |
11:30 AM |
1:02 PM |
1.5 |
Drilled holes for hinge pins in foam pieces for canard tips and microed same onto the canard |
|
4/29/2006 |
7:59 AM |
11:00 AM |
3 |
rebuilt epoxy pump, filled it and made some test batches |
|
4/26/2006 |
7:19 PM |
9:01 PM |
1.7 |
Removed elevators from canard and sanded tips; assembled epoxy pump |
|
4/25/2006 |
7:27 PM |
9:28 PM |
2 |
Leveled the jig table, sanded 0 degree L jigs then set canard and elevator up on table to begin tip fairing work |
|
4/11/2006 |
8:00 PM |
9:00 PM |
1 |
Cut foam blocks for canard tips and started jigging canard onto table |
|
2/26/2005 |
2:15 PM |
4:50 PM |
2.6 |
Jigged the elevators into the correct spot then floxed the NC-3 pieces into the canard and cleaned up |
|
2/15/2005 |
6:25 PM |
8:59 PM |
2.6 |
Jigged the canard to the work table, jigged the elevators to the canard with the L templates and sanded the trailing edge of the canard for proper fit |
|
2/15/2005 |
5:10 PM |
5:31 PM |
0.3 |
Removed the elevators and spool piece from the jig & workbench and cleaned up for the next step |
|
2/13/2005 |
3:33 PM |
5:59 PM |
2.4 |
Jigged elevators flat, drilled holes and bolted them to the spool piece and CZNC-12As, installed NC-3 hinge pieces |
|
2/13/2005 |
11:06 AM |
12:34 PM |
1.5 |
Marked & drilled holes in the spool piece and bolted CZNC-12A pieces to same |
|
1/16/2005 |
10:41 AM |
12:12 PM |
1.5 |
Sanded trailing edge of elevators, began fitting spool piece to CZNC-12As |
|
1/15/2005 |
3:10 PM |
6:00 PM |
2.8 |
Trimmed and sanded the previous layup, test fitted and installed the NC-6s, drilled holes for set screws and began fitting and making the spool piece |
|
1/15/2005 |
8:15 AM |
9:09 AM |
0.9 |
Started measuring and fitting spool piece |
|
1/14/2005 |
6:30 PM |
8:49 PM |
2.3 |
Made the flox corners and added the 1 ply BID layups on the ends of the elevators, and, did the micro/peel ply treatment on the trailing edge |
|
1/9/2005 |
1:27 PM |
3:30 PM |
2 |
Laid up the 2 UNI top skin on the second elevator, vacuum bagged it and cleaned up |
|
12/28/2004 |
8:20 PM |
8:43 PM |
0.4 |
Un-bagged and removed peel ply and etc. from the first elevator top skin |
|
12/28/2004 |
9:41 AM |
12:30 PM |
2.8 |
Cut fiberglass for the top skins of the elevators, then did the 2 UNI layup on one, vacuum bagged it and cleaned up |
|
12/27/2004 |
2:19 PM |
3:36 PM |
1.3 |
Finished sanding leading edges of the elevators and cut the "notch" at the trailing edge |
|
12/27/2004 |
11:50 AM |
12:18 PM |
0.5 |
Started sanding the leading edges of the elevators faired in after the last layup |
|
12/22/2004 |
5:30 AM |
5:50 AM |
0.3 |
Removed the elevator from the vacuum bag and stripped peel ply & etc. |
|
12/21/2004 |
7:53 PM |
9:16 PM |
1.4 |
Did the 2 UNI layup on the bottom of the other elevator and vacuum bagged same |
|
12/19/2004 |
9:18 AM |
12:29 PM |
3.2 |
Cleaned up and did the 2 UNI bottom layup on one elevator via vacuum bagging |
|
9/2/2004 |
6:45 PM |
7:42 PM |
0.9 |
Started getting the elevators laid out on the table for the next layup |
|
8/28/2004 |
1:14 PM |
6:01 PM |
4.8 |
Finished making the rest of the templates and cleaned up |
|
8/28/2004 |
11:42 AM |
12:34 PM |
0.9 |
Continued making additional templates |
|
8/28/2004 |
9:40 AM |
10:50 AM |
1.2 |
Started making other necessary templates |
|
8/10/2004 |
6:16 PM |
7:45 PM |
1.5 |
Microed the torque tubes into the elevator cores |
|
8/9/2004 |
6:58 PM |
8:35 PM |
1.6 |
Finished pop riveting NC-2 inserts into elevator torque tubes, filed notches, cut elevator foam pieces to length, used CA glue to fill slots in torque tubes after installing inserts |
|
8/8/2004 |
3:00 PM |
6:36 PM |
3.6 |
Did the first few assembly steps of the torque tubes up to pop riveting the NC-2 inserts into same |
|
8/8/2004 |
12:11 PM |
1:15 PM |
1.1 |
Sanded the inside elevator of cores to fit aluminum pivot tubes |
|
8/7/2004 |
10:15 AM |
12:15 PM |
2 |
Hot wired the elevator cores with Dan Pettinger in Aurora at his hangar |
|
8/6/2004 |
9:30 PM |
10:15 PM |
0.7 |
Cut foam for hot wiring elevator cores, made shims for templates and drilled templates for nails |
|
7/11/2004 |
1:14 PM |
2:24 PM |
1.2 |
Made a second right side elevator template |
|
7/11/2004 |
11:27 AM |
12:40 PM |
1.2 |
Scanned and printed elevator templates, glued to plywood and sawed/sanded to shape |